Company Profile
Dilovası Sinter Metal
Dilovası Sinter Metal Parça San. Ltd. Şti.
Self-declared profile. Not yet verified by Kim Üretir. How we verify
Profile updated 15 Sept 2026Not verified yet
- Machines
- 10
- 4 verified
- Certifications
- 3
- Response time
- 24 hours
- Founded
- 2011
- Employees
- 51–200
- Facility
- 7,500 m²
Overview
About
Powder-metallurgy structural parts from 5 to 1,200 g: bushings, gears, sprockets, shock-absorber pistons and lock components. Powder presses from 20 to 500 t, mesh-belt sintering furnaces and a MIM cell; SPC to IATF 16949 requirements.
Shown: EnglishVerified by company
Language versions
- TurkishVerified by company
- EnglishVerified by company
- GermanNot available
- Simplified ChineseNot available
- Industries served
- AutomotiveHome AppliancesIndustrial MachineryElectronics
- Export markets
- GermanyItalySpainRomania
- Business languages
- TurkishEnglish
- Industrial zone
- Dilovası OSB
Index snapshot
How it is calculated- Machine modernity
- 59/100
- 75th percentile in Forging & Metal Forming
- Automation
- 0/100
- 50th percentile in Forging & Metal Forming
- Certification strength
- 22/100
- 96th percentile in Forging & Metal Forming
- Export readiness
- 62/100
- 97th percentile in Forging & Metal Forming
Indices are computed from profile data and are not a quality rating.
Capability matrix
Each row is a process the company performs; columns show which materials are covered and the verification level of the evidence.
Powder Metallurgy (Press & Sinter)
Sintered Structural Steel (Press & Sinter)Stainless SteelCopperBrass- Tolerance
- ±0.03 mm
- Max. part size
- 150 × 80 mm
- Batch size
- 5k – 5m
- Evidence
- 5 machines as evidence
Metal Injection Molding (MIM)
Sintered Structural Steel (Press & Sinter)Stainless Steel- Tolerance
- ±0.05 mm
- Max. part size
- 80 mm
- Batch size
- 10k – 2m
- Evidence
- 2 machines as evidence
Legend:Factory verifiedDocument verifiedUnverified
Machine park10 machines
10 units · 4 verified · median year 2019 · 70% under 10 years · 0 with available capacity
Powder Compaction Press
DORST Technologies TPA 500/4
- Press Force
- 500 t
Powder Compaction Press
DORST Technologies TPA 160/3
- Press Force
- 160 t
Powder Compaction Press
Osterwalder CA-SP 60
- Press Force
- 60 t
Sintering Furnace
Cremer Thermoprozessanlagen MUT 600/1150
- Max. Temperature
- 1,150 °C
Sintering Furnace
Elino Mesh-belt 400/1120
- Max. Temperature
- 1,120 °C
Injection Molding Machine
ARBURG ALLROUNDER 370 S (MIM package)
- Clamping Force
- 70 t
Sintering Furnace
Elnik Systems MIM 3045
- Max. Temperature
- 1,450 °C
Products & HS codes
Product families the company supplies, with Harmonized System codes for customs and sourcing.
- CBAM scope
Sintered (PM) Structural Parts
Typical for this product family
Other manufacturers of this product → - CBAM scope
MIM Precision Parts
Typical for this product family
Other manufacturers of this product →
HS codes are indicative. Binding classification only via a BTB (Türkiye) or BTI (EU) ruling.
Trade & logistics
Exports
Export markets
Import sources
Incoterms® 2020 + named place
Lead time
Payment terms
T/T 40% advance · Net 30 (As stated by the company)
Minimum order
Foreign-trade team
Logistics
Road transit to Germany: 3–5 days (indicative, by region)
Türkiye–EU Customs Union: industrial goods enter the EU duty-free with an A.TR certificate (agricultural and ECSC steel products excluded).
Lead time: from order confirmation to ex-works dispatch, unless stated otherwise.
Origin & customs guideExport readiness
5/135 of 13 applicable
- EU (DE, IT, ES, RO) 0/4Missing: EU origin proof (A.TR; EUR.1 for ECSC steel); Incoterm with a named place; Coded payment terms; Material certificates (EN 10204 3.1)
- Active exporter with named markets — Met
- Products carry company-declared 6-digit HS codes — Not declared
- EU origin proof (A.TR; EUR.1 for ECSC steel) — Not declared
- Incoterm with a named place — Not met(Not met)
- Coded payment terms — Not declared
- Sample and series lead times — Not declared
- Minimum order value — Met
- Named foreign-language contact — Not declared
- Valid, verified quality certificate — Met
- Material certificates (EN 10204 3.1) — Not declared
- Verified capacity report — Not declared
- Responds within 24 hours — Met
- Profile updated within 12 months — Met
Export readiness from published data — not a certification.
Materials
Ferrous Metals
- Sintered Structural Steel (Press & Sinter)
- Stainless Steel
Non-Ferrous Metals
- Copper
- Brass
Certificates
3 current · 0 expiring within 90 days · 0 expired or inactive
Quality management
ISO 9001
Quality management system
Valid- Certificate no.
- Not provided
- Issued by
- SGS
- Accreditation
- Accreditation not recorded
- Issued
- Not provided
- Valid until
- 31 Dec 2027
- Scope
- Not provided
- Verification
- Document verified · 2 Apr 2026
IATF 16949
Automotive quality management
Valid- Certificate no.
- Not provided
- Issued by
- SGS
- Accreditation
- Accreditation not recorded
- Issued
- Not provided
- Valid until
- 31 Dec 2027
- Scope
- Not provided
- Verification
- Unverified
Product & other
MPIF Standard 35
Material standards for PM structural parts and MIM parts
No expiry date- Certificate no.
- Not provided
- Issued by
- Not provided
- Accreditation
- Not provided
- Issued
- Not provided
- Valid until
- Not provided
- Scope
- Not provided
- Verification
- Unverified
Standard codes are shown as issued and are never translated.
Quality & inspection
Quality evidence readiness
Rates the evidence published on this profile — not the quality of parts.
Quality management system4.4 / 25
- Best QMS certificate (tier × credit)4.4 / 25
Special-process approvalsNot applicable
Metrology0 / 20
- Measuring equipment evidence0 / 8
- Calibration records0 / 6
- Tolerance vs. measuring capability0 / 6
Quality processes2.5 / 15
- First article / PPAP1.5 / 5
- Process capability (SPC)1 / 4
- Material traceability0 / 4
- Nonconformance handling (8D)0 / 2
Verification & freshness1.4 / 15
- Company verification0 / 10
- Machine verification1.4 / 5
Personnel qualificationNot applicable
How is this computed?
Certificate credit = validity × evidence × issuer legitimacy × completeness. Each component earns points; components that do not apply to this company are removed from the denominator. Score = 100 × points earned ÷ applicable points. A critical flag lowers the band by one level. Calibration records and company-declared quality-system details are not captured yet and count as not demonstrated.
Computed 13 Nov 2026
Quality flags
Computed automatically from the published data. A flag is a question to ask the supplier, not a verdict.
CriticalThe company description claims IATF 16949, but no current, verified certificate is listed
WarningSector certificate is self-declared and unverified: IATF 16949
WarningNo issuing body recorded: MPIF Standard 35
InfoNo certificate number for a registry lookup: ISO 9001, IATF 16949, MPIF Standard 35
InfoCertificate scope not published: ISO 9001, IATF 16949
Quality system
- First-article inspection
- Not declared
- Process capability
- Not declared
- Traceability
- Not declared
- Non-conformance handling
- Not declared
- NDT personnel
- Not declared
- Last external audit
- Not declared
The company has not declared its quality system yet.
- Sintered Density & Porosity Test (ISO 2738)
- Hardness Testing
- Microstructure & Grain Size (Metallography)
- Statistical Process Control (SPC)
- PPAP
- CMM Inspection
Contact
Address
Dilovası OSB, Dilovası, Kocaeli, 41455
Türkiye
Typically responds within 24 hours
Direct contact
No phone or messaging channel published. Request a quote or use the website.
Company facts
- Sectors
- Forging & Metal Forming
- Founded
- 2011
- Employees
- 51–200
- Machines
- 10 (4 verified)
- Languages
- TR, EN
- Response time
- 24 hours
- Verification
- Unverified
Capability matrix
| Processes | Materials | Tolerance | Batch (pcs) |
|---|---|---|---|
| Powder Metallurgy (Press & Sinter) | Sintered Structural Steel (Press & Sinter), Stainless Steel, Copper, Brass | ±0.03 mm | 5k – 5m |
| Metal Injection Molding (MIM) | Sintered Structural Steel (Press & Sinter), Stainless Steel | ±0.05 mm | 10k – 2m |
Machine park
Powder Compaction Press × 6 (3 ✓) · Sintering Furnace × 3 (1 ✓) · Injection Molding Machine × 1
Certificates
- ISO 9001 · SGS · Valid until 31 Dec 2027 · Document verified
- IATF 16949 · SGS · Valid until 31 Dec 2027 · Unverified
- MPIF Standard 35 · — · Unverified
Trade & logistics
- Exports
- Yes — active exporter
- Export markets
- Germany, Italy, Spain, Romania
- Incoterms
- EXW, FCA
- Lead time
- 30–60 days
- Minimum order
- €3,000
- Payment terms
- T/T 40% advance; Net 30
Contact
- Location
- Dilovası, 41455, Kocaeli, Türkiye
Similar manufacturers
Izmir, Türkiye · İAOSB
Engineering · 11–50 employees · since 2011
Exports to Germany, Italy, United Kingdom3–15 d
Istanbul, Türkiye · İTOSB
Contract manufacturer · 11–50 employees · since 2012
Exports to Germany, Netherlands, United Kingdom +2EXW/FCA3–14 d
Exports to Germany, Italy, Spain +1EXW/FCA21–45 d
Ready to request a quote?
Dilovası Sinter Metal